Installation & Maintenance
From the first site survey to scheduled maintenance, one team takes responsibility for your weighbridge.
How a weighbridge installation works
- Requirement & site reviewVehicles, capacity, traffic flow, ground conditions and drainage decide the platform size and pit, pitless or portable type.
- Foundation drawingWe share the civil drawing for your contractor — or supply ready precast foundation blocks.
- Civil readiness checkOur team checks levels, dimensions and drainage before the platform is dispatched.
- Erection & electronicsPlatform modules, load cells, junction box, indicator, software and any automation are installed.
- Calibration & commissioningThe weighbridge is calibrated with test weights, commissioned and handed over with operator guidance.




Keeping it accurate
Dirt build-up, water ingress, cable damage and power surges are the most common causes of weighbridge faults. Planned maintenance and the right protection prevent most of them.
- Preventive maintenance contracts with scheduled visits
- Breakdown service from our branch network
- Load cell replacement and digital upgrades
- Recalibration and legal metrology stamping assistance
- Protection with the power surge protection device
Request installation or maintenance
Share the equipment and location. Our service team will contact you to plan the visit.